Aziz Construction is a licensed general contractor (CSLB #1103807) based in Palo Alto. We build detached ADUs, attached ADUs, garage conversions and junior ADUs for Palo Alto homeowners. A detached ADU here typically costs $260,000 to $550,000 to build and takes 8 to 14 months from the first design meeting to move-in.
The ADUs we build in Palo Alto
- Detached ADU: a separate backyard home. Palo Alto allows an 800 square foot detached ADU on any eligible lot, and 900 to 1,000 square feet is possible.
- Attached ADU: a unit joined to the main home, up to 900 square feet with one bedroom or 1,000 square feet with two or more.
- Garage conversion: an existing garage turned into a home. Palo Alto does not require the lost garage parking to be replaced.
- Junior ADU: up to 500 square feet inside the main home. The owner must live in the main home or the junior ADU.
Compare the first two in our garage conversion versus detached ADU guide, and see finished interiors in our ADU project gallery.
What an ADU costs to build in Palo Alto
An ADU in Palo Alto typically costs $125,000 for a simple garage conversion up to $550,000 for a two-bedroom detached unit, or roughly $325 to $650 per square foot. These are construction costs: labor and materials, including standard finishes.
| ADU type | Typical size | Construction cost |
|---|---|---|
| Junior ADU (JADU), inside the house | 250 to 500 sq ft | $75,000 to $150,000 |
| Garage conversion | 350 to 450 sq ft | $125,000 to $215,000 |
| Attached ADU | 500 to 800 sq ft | $235,000 to $400,000 |
| Detached ADU, 1 bedroom | 450 to 650 sq ft | $260,000 to $400,000 |
| Detached ADU, 2 bedrooms | 700 to 1,000 sq ft | $360,000 to $550,000 |
Budget separately for design, engineering and the Title 24 energy report, typically $10,000 to $35,000, and about $3,500 for a separate PG&E meter and panel upgrade. Palo Alto charges no impact fees on an ADU under 750 square feet. These are typical ranges, not a quote; your exact price is quoted at consultation and depends on the job. See the full breakdown in our Palo Alto ADU cost and timeline guide.
How long a Palo Alto ADU takes
A detached ADU usually takes 8 to 14 months from the first design meeting to move-in, and a garage conversion or junior ADU 5 to 8 months. Design and City review come first; construction starts once the permit is issued.
| Phase | Typical time |
|---|---|
| Design and engineering | 6 to 10 weeks |
| City permit review in Palo Alto | 6 to 12 weeks |
| Construction, junior ADU | 2 to 4 months |
| Construction, garage conversion | 3 to 5 months |
| Construction, attached ADU | 5 to 8 months |
| Construction, detached ADU | 6 to 10 months |
For a standalone ADU or junior ADU, Palo Alto gives the first plan review in 14 days and reviews each resubmittal in about a week, according to the City’s 2026 prohousing application. A complete first submission saves more time than anything done later. Read more in how long it takes to build an ADU.
What we handle, from design to move-in
One team manages your ADU, so you have one point of contact through the build:
- Feasibility and scope: your lot, the unit type and how the ADU will be used.
- Design coordination and engineering: drawings, structural engineering and the Title 24 energy report.
- Permit support: the City submission and responses to plan-check comments.
- Construction: site preparation, foundation, framing, roofing, plumbing, electrical and HVAC.
- Finishes, inspections and completion: interior finishes, City inspections and handover.
Read more about our ADU construction service.
Palo Alto ADU rules to check first
The City’s 2025 ADU and JADU guidebook sets the main limits:
- Height: 16 feet for a detached ADU, or 18 feet within half a mile of transit, plus 2 feet to match the main home’s roof pitch.
- Setbacks: 4 feet from side and rear lot lines and 3 feet from the main house.
- Parking: none is required for a new ADU.
- Rentals: an ADU or junior ADU must be rented for 30 days or more.
Palo Alto also runs a Master ADU permit program that speeds up review when you choose a pre-approved ADU plan. Eichler, Single-Story Overlay and historic rules can also shape an ADU; see our Palo Alto remodeling and ADU page for those rules and the City sources.
Palo Alto ADU questions
Do you build ADUs in Palo Alto?
How much does it cost to build an ADU in Palo Alto?
How long does it take to build an ADU in Palo Alto?
Is a garage conversion cheaper than a detached ADU in Palo Alto?
Do I pay impact fees on a Palo Alto ADU?
How big can an ADU be in Palo Alto?
What should I bring to an ADU consultation?
ADU construction in nearby cities
We also build ADUs in Mountain View, Sunnyvale, Cupertino, Santa Clara and San Jose. See all service areas.
City rules on this page come from the City of Palo Alto’s own publications, as checked on November 17, 2026. Requirements can change; use the current City guidance for your property.
Tell us about your Palo Alto ADU
Share your address, any existing plans, who the ADU is for and your preferred timing. Send a project inquiry or call (650) 787-5802.