Aziz Construction

Remodeling, ADUs and additions

Home remodeling & construction in Belmont.

Aziz Construction is a residential general contractor based in Palo Alto, and we take on kitchen and bathroom remodels, whole-home renovations, additions and ADUs in Belmont. This page sets out typical costs, how Belmont’s pre-approved ADU program works, how long plan check takes, when design review applies and which trees are protected.

Discuss your Belmont project ↗

What a Belmont remodel or ADU typically costs

In Belmont and across the Peninsula, a kitchen remodel typically costs $38,000 to $145,000 for a refresh or mid-range remodel, and a detached ADU typically costs $260,000 to $550,000 to build. These are construction costs: labor and materials. Design, engineering, permits and City fees are extra.

ProjectTypical construction cost
Kitchen refresh, same layout$38,000 to $72,000
Kitchen remodel, mid-range$80,000 to $145,000
Kitchen remodel, high-end$140,000 to $260,000 or more
Junior ADU inside the house$75,000 to $150,000
Garage conversion ADU$125,000 to $215,000
Detached ADU, 1 bedroom$260,000 to $400,000
Detached ADU, 2 bedrooms$360,000 to $550,000

These are typical ranges, not a quote. Your exact price is quoted at consultation and depends on the job. See the full breakdowns, including fees and what moves the price, in our kitchen remodel cost guide and our garage conversion versus detached ADU comparison.

Belmont’s pre-approved ADU program

Belmont reviews ADU plans from designers ahead of time and lists approved plans in the City’s ADU Plans Gallery. Once a homeowner picks one, staff review the site-specific application within 30 days of it being complete (City of Belmont pre-approved ADU program).

ADUs of 750 square feet or more pay Transportation and Park Impact Fees, due when the application is submitted, so a unit just under 750 square feet avoids them. A pre-approved plan saves design time, but the foundation, utilities and access still depend on your lot, especially on a slope.

How long Belmont permits take

The City’s Permit Center currently lists plan check times of 24 to 30 days, 10 to 15 days for resubmittals and revisions, and 30 to 45 days for the first review of a new building. Over-the-counter applications take 1 to 21 days with a complete submittal, and many permits can be issued automatically online through Symbium.

When Belmont design review applies

Belmont’s Zoning Ordinance says all new construction and exterior changes are subject to design review. New homes and additions must also meet the City’s Residential Design Criteria if they create or expand an upper floor, or exceed a ground-floor plate height of 12 feet or a roof height of 18 feet (Belmont Zoning Ordinance excerpt, current through 2020). A second story is the most common trigger, so plan for that review before drawings are finished.

Protected trees in Belmont

In Belmont, a Coast Live Oak, Valley Oak, Redwood, Madrone, Bay Laurel or Buckeye with a trunk 10 inches or more across at 4½ feet above grade is protected, and so are other large trees from 14 inches across. Removing a protected tree needs a permit (City of Belmont tree permits). Locate protected trees before siting an ADU or addition.

Construction services for your home

Explore our kitchen remodeling, bathroom remodeling, whole-home renovation, room additions, ADU construction and design coordination within construction projects. Scope, pricing and schedule are confirmed for each property; a website guide does not establish approval to build.

See our recent work

We have not yet published a Belmont project. See finished work nearby in our project portfolio, including a Mountain View home renovation and a 1962 San Jose home renovation.

Belmont remodeling and ADU questions

Does Belmont have pre-approved ADU plans?
Yes. Belmont lists pre-approved ADU plans in its ADU Plans Gallery, and staff review the site-specific application within 30 days of it being complete.
Are there impact fees on an ADU in Belmont?
ADUs of 750 square feet or more pay Transportation and Park Impact Fees when the application is submitted. Smaller ADUs do not pay them.
How long does plan check take in Belmont?
The City currently lists 24 to 30 days for plan check, 10 to 15 days for resubmittals and 30 to 45 days for the first review of a new building.
Does a second story in Belmont need design review?
Yes. All new construction and exterior changes are subject to design review, and an addition that creates or expands an upper floor must also meet the City’s Residential Design Criteria.
Which trees are protected in Belmont?
Native oaks, redwoods, madrones, bay laurels and buckeyes 10 inches or more across at 4½ feet above grade are protected, as are other large trees from 14 inches across. Removing one needs a permit.
How much does a kitchen remodel cost in Belmont?
A kitchen remodel on the Peninsula typically costs $38,000 to $72,000 for a refresh, $80,000 to $145,000 for a mid-range remodel and $140,000 to $260,000 or more for a high-end remodel. These are typical ranges, not a quote.

Official local planning resources

City rules on this page were checked against the City of Belmont’s own pages on November 17, 2026. Requirements can change; use the current jurisdiction guidance for your property.

Tell us about your property

We serve selected neighborhoods within our listed communities. Share your address, available plans, project priorities and preferred timing so we can confirm coverage and discuss next steps. Send a project inquiry or call (650) 787-5802.