Confirm the address and authority first
Palo Alto and Menlo Park are separate jurisdictions. Before discussing a permit forecast, establish which authority reviews the actual property and which type of ADU is proposed. A nearby project's approval does not establish your own requirements.
Use HCD's ADU resource center for current state information and obtain the local authority's current submission instructions. This guide does not promise a review period, buildable size or approval outcome.
Assemble what is already known
Collect available plans, permit history, property information and photos. Explain whether the concept involves a separate building, an addition or conversion of existing space. Note known alterations and questions about utilities or access so the team can identify useful early investigation.
Ask which records and measurements can be relied on. A drawing that predates later alterations may not accurately describe the home today.
Map the review responsibilities
Ask who will prepare architectural documents, engineering information and other applicable materials. Identify who submits the application, monitors correspondence and coordinates responses. Design coordination within a construction project should not be confused with a separate professional design engagement.
- Confirm the proposed classification and applicable standards.
- Identify what the authority considers a complete submission.
- Track open questions and the person responsible for each answer.
- Keep review comments and responses tied to the current drawing version.
- Confirm the approvals and inspections needed before the relevant work proceeds.
Treat the schedule as a sequence of dependencies
Preparing documents, obtaining review, responding to comments and planning construction are separate tasks. Ask what must happen before each milestone and which assumptions are unresolved. Do not treat an administrative processing estimate as a guaranteed permit issuance date.
Coordinate procurement with design and review decisions. Ordering a product before dimensions or approvals are settled can create a different risk from waiting too long to order it; evaluate that tradeoff with the project team.
Keep budget and use assumptions visible
Ask for a scope-based budget including professional coordination, site and utility work, construction, applicable fees and owner purchases. If rental use matters, verify relevant rules and market assumptions separately. There is no guaranteed rent or payback period.
Next step