Aziz Construction

ADU builder serving Atherton

ADU construction in Atherton, CA

Aziz Construction is a licensed general contractor (CSLB #1103807) based in nearby Palo Alto. We build detached ADUs, attached ADUs, garage conversions and junior ADUs for homeowners in our selected Atherton service area. A detached ADU typically costs $260,000 to $550,000 to build and takes 8 to 14 months from the first design meeting to move-in.

Discuss your Atherton ADU ↗

The ADUs we build in Atherton

  • Detached ADU: a freestanding home on the lot. The Town’s ADU brochure allows an ADU of up to 1,200 square feet.
  • Attached ADU: connected to the main home by at least one wall, with its own entrance on the side or rear where feasible.
  • Converted ADU: built within existing space or the footprint of an existing permitted accessory structure, such as a garage. It needs side and rear setbacks sufficient for safety and its own front door.
  • Junior ADU: up to 500 square feet, contained entirely within the house, with an efficiency kitchen and a separate or shared bathroom.

Compare the options in our garage conversion versus detached ADU guide.

What an ADU costs to build in Atherton

An ADU in Atherton and across the Peninsula typically costs $125,000 for a simple garage conversion up to $550,000 for a two-bedroom detached unit, or roughly $325 to $650 per square foot. These are construction costs: labor and materials, including standard finishes. Custom finishes, long utility runs and tree protection push a project toward the top of the range or beyond it.

ADU typeTypical sizeConstruction cost
Junior ADU (JADU), inside the house250 to 500 sq ft$75,000 to $150,000
Garage conversion350 to 450 sq ft$125,000 to $215,000
Attached ADU500 to 800 sq ft$235,000 to $400,000
Detached ADU, 1 bedroom450 to 650 sq ft$260,000 to $400,000
Detached ADU, 2 bedrooms700 to 1,000 sq ft$360,000 to $550,000

Budget separately for design, engineering and the Title 24 energy report, typically $10,000 to $35,000. The Town has waived a number of its own permit fees for ADUs, but outside agencies charge their own permit and service fees: the Menlo Park Fire Protection District, CalWater and, depending on the property, Fair Oaks Sanitary or West Bay Sanitary (Town of Atherton ADU page). The application also needs a school district notice that impact fees are paid or waived. These are typical ranges, not a quote; your exact price is quoted at consultation. See what moves the price in our ADU cost and timeline guide.

What Atherton asks for with an ADU permit

Atherton’s ADU process page lists the documents a complete application needs. Plans are filed through the Town’s Building ePlan submittal portal, and a complete application includes:

  • Site plan: setbacks from property lines, structures and trees.
  • Construction, Operations and Parking plan: how construction access, operations and parking will be handled on the property.
  • Tree protection plan: protection has to be installed and inspected before the permit is issued.
  • Geotechnical report: or a soils report waiver request.
  • Outside approvals: a Menlo Park Fire Protection District approval letter and a school district notice that impact fees are paid or waived.
  • Business licenses: the general contractor needs a Town business license before the permit is issued, and each subcontractor before final inspection.

Grading, landscape screening and water-efficient landscaping plans can need separate submittals. We gather these with the drawings so the first submission is complete.

How long an Atherton ADU takes

A detached ADU usually takes 8 to 14 months from the first design meeting to move-in, and a garage conversion or junior ADU 5 to 8 months. Design, the Town’s site documents and outside agency approvals come first; construction starts once the permit is issued.

PhaseTypical time
Design and engineering6 to 10 weeks
Town permit reviewState law requires a decision within 60 days of a complete application
Construction, junior ADU2 to 4 months
Construction, garage conversion3 to 5 months
Construction, attached ADU5 to 8 months
Construction, detached ADU6 to 10 months

The fire district letter and tree protection inspection run alongside plan review, so we start them early. Read more in how long it takes to build an ADU.

What we handle, from design to move-in

One team manages your ADU, so you have one point of contact through the build:

  1. Feasibility and scope: your lot, the unit type and how the ADU will be used.
  2. Design coordination and engineering: drawings, structural engineering and the Title 24 energy report.
  3. Permit support: the Town submission and responses to plan-check comments.
  4. Construction: site preparation, foundation, framing, roofing, plumbing, electrical and HVAC.
  5. Finishes, inspections and completion: interior finishes, Town inspections and handover.

Read more about our ADU construction service.

Atherton ADU rules to check first

  • Current standards: ADUs are governed by Chapter 17.52 of the Atherton Municipal Code, last updated in March 2024. Amendments for the 2024 and 2025 state ADU laws went to the City Council in November 2025, so we confirm the current height, setback and parking standards with the Planning Department before design (Town ADU page).
  • Parking: the Town’s brochure says most ADUs need one parking space, reachable from the street and screened from it; tandem parking on an existing driveway may qualify.
  • Pre-approved plans: designers can have ADU plans approved by the Town, which then lists them, and the Town points to the San Mateo County ADU Resource Center’s pre-approved designs (Town building ADU page).
  • Unpermitted units: the Town’s ADU Amnesty Program, open through January 1, 2030, can legalize an ADU that existed before January 1, 2020.

The lot shapes the rest. In Atherton’s main residential district, the main house is limited to a floor area of 18% of the lot and sits at least 60 feet from the front and rear lot lines (Municipal Code 17.32.040); the ADU chapter sets the ADU’s own limits. Mature trees, driveway access for construction and the sewer district that serves the property all affect where an ADU can go and what the site work costs. See our Atherton remodeling and construction page for other Town resources.

Atherton ADU questions

Do you build ADUs in Atherton?
Yes. Aziz Construction is a licensed general contractor (CSLB #1103807) based in nearby Palo Alto. We build detached ADUs, attached ADUs, garage conversions and junior ADUs in our selected Atherton service area and our other Peninsula and South Bay service areas, and manage the project from design coordination and permits through construction, inspections and move-in.
How much does it cost to build an ADU in Atherton?
A detached ADU typically costs $260,000 to $400,000 to build with one bedroom and $360,000 to $550,000 with two, with standard finishes. A garage conversion typically costs $125,000 to $215,000 and a junior ADU inside the house $75,000 to $150,000. Design, engineering, permits, Town and outside agency fees are extra, and custom finishes push the price up. These are typical ranges, not a quote.
How big can an ADU be in Atherton?
The Town’s ADU brochure allows an ADU of up to 1,200 square feet and a junior ADU of up to 500 square feet inside a single-family home. Atherton has been updating its ADU chapter for recent state laws, so confirm the current height, setback and parking standards with the Planning Department before design.
Does Atherton have pre-approved ADU plans?
Yes. Designers can have ADU plans approved by the Town, which then lists them on its website, and the Town also points homeowners to the pre-approved designs of the San Mateo County ADU Resource Center. A pre-approved plan still needs a site plan, tree protection plan and the other site-specific documents.
What does Atherton need with an ADU permit application?
Besides the drawings, the Town asks for a site plan showing trees, a Construction, Operations and Parking plan, a tree protection plan, a geotechnical report or soils report waiver, a Menlo Park Fire Protection District approval letter and a school district notice that impact fees are paid or waived. Tree protection must be installed and inspected before the permit is issued.
Can I legalize an existing unpermitted ADU in Atherton?
Possibly. Atherton’s ADU Amnesty Program, open through January 1, 2030, lets eligible homeowners legalize an unpermitted ADU that existed before January 1, 2020, through review, inspections, permits and any required safety upgrades.
How long does it take to build an ADU in Atherton?
A detached ADU usually takes 8 to 14 months from the first design meeting to move-in, and a garage conversion or junior ADU 5 to 8 months. Plan on 6 to 10 weeks for design and engineering, plus time to gather the Town’s site documents and outside agency approvals before the permit is issued.

ADU construction in nearby cities

We also build ADUs in Palo Alto, Menlo Park, Los Altos and Mountain View. See all service areas.

Town rules on this page come from the Town of Atherton’s own pages, brochure and municipal code, as checked on November 17, 2026. Atherton is updating its ADU rules; use the current Town guidance for your property.

Tell us about your Atherton ADU

Share your address, any existing plans, who the ADU is for and your preferred timing. Send a project inquiry or call (650) 787-5802.