Aziz Construction

ADU builder serving Los Altos

ADU construction in Los Altos, CA

Aziz Construction is a licensed general contractor (CSLB #1103807) based in nearby Palo Alto. We build detached ADUs, attached ADUs, garage conversions and junior ADUs for Los Altos homeowners. A detached ADU typically costs $260,000 to $550,000 to build and takes 8 to 14 months from the first design meeting to move-in.

Discuss your Los Altos ADU ↗

Los Altos or Los Altos Hills?

The rules on this page are the City of Los Altos’s. Los Altos Hills is a separate town with its own Building Department and ADU rules, even where postal names and ZIP codes overlap. Confirm which jurisdiction serves the property before anyone starts drawings; our Los Altos and Los Altos Hills page links both.

The ADUs we build in Los Altos

  • Detached ADU: a separate backyard home of up to 1,200 square feet and 18 feet high under the City’s ADU guide.
  • Attached ADU: a unit joined to the main home, up to 1,200 square feet but no more than half the main home’s floor area, and 16 feet high or the zoning district’s height, whichever is greater.
  • Garage conversion: an existing garage turned into a home. The structure has to be brought up to the building code for living space, so we check its foundation, framing and utilities first.
  • Junior ADU: up to 500 square feet inside a single-family home, with its own exterior entrance. It can share the main home’s bathroom if there is an inside connection.

Owner occupancy is not required for a standard ADU. Junior ADUs have separate occupancy and deed-restriction requirements; confirm the current rules for your bathroom configuration with City Planning. Compare the first two in our garage conversion versus detached ADU guide.

What an ADU costs to build in Los Altos

An ADU in Los Altos and across the Peninsula typically costs $125,000 for a simple garage conversion up to $550,000 for a two-bedroom detached unit, or roughly $325 to $650 per square foot. These are construction costs: labor and materials, including standard finishes.

ADU typeTypical sizeConstruction cost
Junior ADU (JADU), inside the house250 to 500 sq ft$75,000 to $150,000
Garage conversion350 to 450 sq ft$125,000 to $215,000
Attached ADU500 to 800 sq ft$235,000 to $400,000
Detached ADU, 1 bedroom450 to 650 sq ft$260,000 to $400,000
Detached ADU, 2 bedrooms700 to 1,000 sq ft$360,000 to $550,000

Budget separately for design, engineering and the Title 24 energy report, typically $10,000 to $35,000, and about $3,500 for a separate PG&E meter and panel upgrade. A City permit-ready plan removes most of the design fee, but the site plan, utility runs and foundation are still specific to your lot. Under state law, an ADU under 750 square feet pays no impact fees. These are typical ranges, not a quote; your exact price is quoted at consultation. See what moves the price in our ADU cost and timeline guide.

Free City plans and pre-approved designs

Los Altos gives homeowners three ways to design an ADU (City of Los Altos ADU page):

  • City permit-ready plans, free: detached ADUs of 525 square feet (studio or one bedroom), 854 square feet (one bedroom) and 1,190 square feet (two bedrooms), each in a Mediterranean, Traditional or Contemporary style. Full drawing sets can be viewed at City Hall. Some options are built in, but the City does not allow other changes.
  • Pre-approved private designs: plans the City’s Building and Planning Divisions have already reviewed, currently from 330 to 800 square feet. You contract with the designer, who keeps the copyright, and add the details for your property.
  • A custom design: a site-specific detached or attached ADU drawn for your lot.

Each path is submitted by email to the City’s Building Division with its own submittal checklist. A ready-made plan saves design time, but grading, drainage, utilities and protected trees on your lot still decide where the unit can go and what the site work costs.

How long a Los Altos ADU takes

A detached ADU usually takes 8 to 14 months from the first design meeting to move-in, and a garage conversion or junior ADU 5 to 8 months. Design and City review come first; construction starts once the permit is issued.

PhaseTypical time
Design and engineering6 to 10 weeks
City permit reviewState law requires a decision within 60 days of a complete application
Construction, junior ADU2 to 4 months
Construction, garage conversion3 to 5 months
Construction, attached ADU5 to 8 months
Construction, detached ADU6 to 10 months

Because Los Altos approves ADUs ministerially, there is no planning hearing to schedule: the project goes straight to a building permit. A complete first submission saves more time than anything done later. Read more in how long it takes to build an ADU.

What we handle, from design to move-in

One team manages your ADU, so you have one point of contact through the build:

  1. Feasibility and scope: your lot, the unit type and how the ADU will be used.
  2. Design coordination and engineering: drawings, structural engineering and the Title 24 energy report.
  3. Permit support: the City submission and responses to plan-check comments.
  4. Construction: site preparation, foundation, framing, roofing, plumbing, electrical and HVAC.
  5. Finishes, inspections and completion: interior finishes, City inspections and handover.

Read more about our ADU construction service.

Los Altos ADU rules to check first

The City’s ADU information guide and ADU page set the main limits:

  • Approval: ministerial. Only a building permit and related permits are needed, with no planning permit, public notice or hearing.
  • Setbacks: 4 feet from side and rear lot lines, the zoning district’s front setback, and 5 feet between buildings.
  • Parking: required for a detached or attached ADU, with exceptions in the zoning code; none for a junior ADU.
  • Protected trees: any tree 12 inches or more across, or a native tree 10 inches or more across, measured 48 inches above the ground, needs a Tree Removal Permit before removal (City tree removal handout, March 2024).

A second story on the main house is different: the City’s Zoning Administrator reviews a new two-story house or a second-story addition, so plan that review separately if you are adding to the house as well. Locate protected trees before placing the ADU, since a tree near the footprint can move the design.

Los Altos ADU questions

Do you build ADUs in Los Altos?
Yes. Aziz Construction is a licensed general contractor (CSLB #1103807) based in nearby Palo Alto. We build detached ADUs, attached ADUs, garage conversions and junior ADUs in Los Altos and our other Peninsula and South Bay service areas, and manage the project from design coordination and permits through construction, inspections and move-in.
How much does it cost to build an ADU in Los Altos?
A detached ADU typically costs $260,000 to $400,000 to build with one bedroom and $360,000 to $550,000 with two. A garage conversion typically costs $125,000 to $215,000 and a junior ADU inside the house $75,000 to $150,000. These are construction costs; design, engineering, permits and City and utility fees are extra. They are typical ranges, not a quote.
How big can an ADU be in Los Altos?
The City’s ADU information guide allows a detached ADU of up to 1,200 square feet and 18 feet high. An attached ADU can also be up to 1,200 square feet, but no more than half the floor area of the main home. A junior ADU can be up to 500 square feet inside a single-family home.
Does Los Altos have free ADU plans?
Yes. The City offers free permit-ready plans for a detached ADU in three sizes, 525, 854 and 1,190 square feet, each in Mediterranean, Traditional or Contemporary style. The City does not allow changes beyond the options built into the plans, and the site plan, utilities and foundation still depend on your lot.
Does an ADU in Los Altos need a public hearing?
No. Los Altos approves ADUs and junior ADUs ministerially, so only a building permit and related permits are needed, with no planning permit, public notice or hearing. That is different from a second-story addition to a house, which the Zoning Administrator reviews.
How long does it take to build an ADU in Los Altos?
A detached ADU usually takes 8 to 14 months from the first design meeting to move-in, and a garage conversion or junior ADU 5 to 8 months. Plan on 6 to 10 weeks for design and engineering before the permit application; a City permit-ready plan can shorten the design stage.
Do the Los Altos ADU rules apply in Los Altos Hills?
No. Los Altos Hills is a separate town with its own Building Department and rules, even where mailing addresses overlap. Confirm which jurisdiction serves the property before you rely on a checklist.

ADU construction in nearby cities

We also build ADUs in Palo Alto, Menlo Park, Atherton, Mountain View, Sunnyvale and Cupertino. See all service areas.

City rules on this page come from the City of Los Altos’s own pages and ADU information guide, as checked on November 17, 2026. Requirements can change; use the current City guidance for your property.

Tell us about your Los Altos ADU

Share your address, any existing plans, who the ADU is for and your preferred timing. Send a project inquiry or call (650) 787-5802.